TAMTTI-TX (Texas A&M Transportation Institute PUF Research Endowment) → EQT INFRASTRUCTURE VI (NO.2) USD SCSP
Field-by-field provenance and archived filing evidence for one of the 5 open public preview records on TAMTTI-TX (Texas A&M Transportation Institute PUF Research Endowment)’s profile — accessible without registration.
Holdings Schedule Disclosure — Reported Portfolio Fair Market Value (Not Original Commitment)
The cited financial schedule for TAMTTI-TX (Texas A&M Transportation Institute PUF Research Endowment) reports period-end portfolio fair market value / carrying value or invested cost ($37.5M) rather than original commitment check size. This figure is classified as Reported holding / fair value (not original commitment) (not an original commitment ticket) so GPs do not mistake current holding value for initial fund commitment size.
Field-Level Provenance & Substantiation Breakdown
Each claim is evaluated independently against the cited table’s headers and units. Different fields on a single record may originate from distinct schedules.
| Record Field | Recorded Value | Value Type | Substantiation Status | Field-Specific Source Citation & Audit Note |
|---|---|---|---|---|
| Fund / Legal Vehicle | EQT INFRASTRUCTURE VI (NO.2) USD SCSP | Reported | Table-Substantiated |
pdf_archive/TAMTTI_TX/TAMTTI_TX_2024_ACFR.pdf (PDF Page 50 of 84 · Printed Page 49)
Matched on cited page in 'SCHEDULE H'. Row excerpt: "EQT INFRASTRUCTURE VI (NO.2) USD SCSP....................................... 37,449,410"
|
| Disclosed Holding / Fair Market Value | $37.5M (raw: 37.45) | Reported | Holding / Fair Value (Not Commitment) |
pdf_archive/TAMTTI_TX/TAMTTI_TX_2024_ACFR.pdf (PDF Page 50 of 84 · Printed Page 49)
Substantiated on cited holdings schedule (exact_or_unspecified, USD) reporting portfolio fair market / carrying value rather than the allocator's original commitment check size.
|
| Fund Vintage Year | 2025 | Reported | Not Yet Page-Verified |
pdf_archive/TAMTTI_TX/TAMTTI_TX_2024_ACFR.pdf (PDF Page 50 of 84 · Printed Page 49)
Retained from allocator disclosure / fund vintage registry without substituting filing year.
|
| Net IRR | Not disclosed | Missing / Unverified | Not Yet Page-Verified |
Not disclosed
Net IRR is not disclosed for this record (never defaulted to 0 or 1.00x).
|
| TVPI / Net Multiple | Not disclosed | Missing / Unverified | Not Yet Page-Verified |
Not disclosed
TVPI / Net Multiple is not disclosed for this record (never defaulted to 0 or 1.00x).
|
| DPI (Realized Multiple) | Not disclosed | Missing / Unverified | Not Yet Page-Verified |
Not disclosed
DPI (Realized Multiple) is not disclosed for this record (never defaulted to 0 or 1.00x).
|
Archived Filing Excerpt — PDF Page 50 of 84 (Printed Page 49)
Table Class: Nav Or Fair Value Holdings
Archived file TAMTTI_TX_2024_ACFR.pdf · Detected Table Title: SCHEDULE H ·
Table Units: exact_or_unspecified (USD).
Full horizontal row highlighting retains surrounding headers, units, and footnotes.
c711d81fde7d9458…69a4975ba90b
— SHA-256 is a file-byte integrity check confirming the archived file has not changed since retrieval. It does NOT prove factual or extraction accuracy.
All 5 Open Public Source Trails for TAMTTI-TX (Texas A&M Transportation Institute PUF Research Endowment)
Click any preview record below to inspect its primary source trail without registrationRequest Pilot Access to Full Workspace Data for TAMTTI-TX (Texas A&M Transportation Institute PUF Research Endowment)
You are viewing 1 of 5 open public source trails (out of 13 total tracked records for TAMTTI-TX (Texas A&M Transportation Institute PUF Research Endowment)). Join the early-access waitlist to request pilot access:
- All 13 tracked historical disclosure records & field-level provenance
- Separated active searches, RFPs, approved pacing plans & CIO governance updates
- Bilateral Shared-Fund Co-Investor Graph across 5,000 LPs
- Retained gatekeeper consultants & investment leadership contacts
Join the Early-Access Waitlist
Enter your firm email to request pilot onboarding for TAMTTI-TX (Texas A&M Transportation Institute PUF Research Endowment) and our interactive GP workspace.
Thank you for joining the Prilago early-access waitlist! We will reach out with pilot access details for your firm.