Skip to main content
Public Pension Plan CAFR / Board Packet Roadshow Hub: Southeast (NC / GA / TN / SC / AL / KY / LA) HQ: Nashville, TN

EPBRP-TN (Chattanooga Electric Power Plan)

$0.5B Total AUM · Institutional LP profile covering 17 historical fund disclosure records ($112.2M parsed USD across disclosed rows) across disclosed strategy exposure in Buyout, Private Credit, Private Equity, Real Estate, Multi-Strategy (investment geography mandates are evaluated separately from LP headquarters). 5 complete primary source trails are open below without registration.

Test Suitability Demo
Disclosed Records
17
5 Open Source Trails Below
Sum of Disclosed Rows
$112.2M
Total AUM: $0.5B
Median Disclosed Amount
$2.2M
Range: $1.2M – $37.0M
Disclosed Fund Multiples
13.7% Mean IRR (n=5) · 1.58x Mean TVPI (n=5)
Unweighted mean of disclosed funds (not portfolio return · As-of 2025)

Historical Fund Disclosures — EPBRP-TN (Chattanooga Electric Power Plan)

5 Open Source Trails (No Registration)

Showing 5 open preview records out of 17 total tracked records (+12 gated pilot rows). Click Inspect Source on any row to view field-level substantiation, table headers/units, and archived page excerpts without login.

Disclosed Fund / Vehicle Strategy Fund Vintage Disclosed Amount Disclosed Performance Primary Source Trail
H&F Buyout Fund XII Buyout 2023
$2.2M
Historical commitment · As of December 2025
Page Anchor Mismatch · Not Yet Page-Verified Inspect Source · CAFR / Board Packet (PDF p.94)
H&F Corporate Investors XI Private Equity 2023
$2.0M
Historical commitment · As of December 2025
Page Anchor Mismatch · Not Yet Page-Verified Inspect Source · CAFR / Board Packet (PDF p.94)
H&F Equity Fund XI Buyout 2022
$2.5M
Historical commitment · As of December 2025
Page Anchor Mismatch · Not Yet Page-Verified Inspect Source · CAFR / Board Packet (PDF p.94)
H&F Capital Partners X Buyout 2021
$2.2M
Historical commitment · As of December 2025
Page Anchor Mismatch · Not Yet Page-Verified Inspect Source · CAFR / Board Packet (PDF p.94)
H&F Capital Partners IX Buyout 2021
$2.2M
Historical commitment · As of December 2025
Page Anchor Mismatch · Not Yet Page-Verified Inspect Source · CAFR / Board Packet (PDF p.94)

Forward-Looking Searches, Pacing Plans & Governance Updates — EPBRP-TN (Chattanooga Electric Power Plan)

Tracked separately from historical commitments: active RFPs/searches, board pacing plans, leadership/CIO updates, and retained gatekeeper consultants.

Allocation-Policy / Pacing Update

EPBRP-TN (Chattanooga Electric Power Plan) (Public Pension Plan, $0.5B AUM): Disclosed FY2025-2026 Private Markets Pacing & Allocation Update (PE Target 11.0% vs. 9.6% Actual; $7.0M Unallocated Target Bandwidth). Active FY2026 public pension pacing targeting Fixed Income, Real Estate, Public Equity with quarterly investment committee allocations and re-up commitments. Gatekeeper / Intake Conduit: RVK.

Forward-looking board pacing or target-allocation policy update · Recorded 2025-01-21

Join Waitlist for Full Signal Log →
Pacing & Allocation Policy Pilot Gated

Board-Approved Pacing Plans, Active RFPs & Target-vs-Actual Allocation Gap

Join waitlist for pacing dossier →

Gatekeeper Consultants (1) Pilot Gated

Retained Private Markets Advisors & Emerging-Manager Search Conduits

Join waitlist for consultant map →

Investment Team Contacts (4) Pilot Gated

CIO, Private Markets Officers & Official Pitch Intake Guidance

Join waitlist for team directory →

Shared-Fund Co-Investor Overlap & Potential Introduction Paths — EPBRP-TN (Chattanooga Electric Power Plan)

286 Shared-Fund Co-LPs

Institutions disclosing the same resolved underlying fund vehicles as EPBRP-TN (Chattanooga Electric Power Plan) (10 shared vehicles tracked; showing top 3 bilateral overlaps).

Explore Paths in Interactive Demo
1. Shared Fund Exposure: Documented for both LPs
2. LPAC Seat Overlap: Not disclosed in filings
3. Personal Relationship: Unknown (customer-supplied)
4. Intro Willingness: Unconfirmed potential path
#1 Shared-Fund Peer 5 Shared Vehicles

Hudson Valley Emerald Coast Vanderbilt Institutional Outsourced CIO & Wealth Advisory

OCIO / Wealth RIA North America
Resolved Shared Vehicle Recent Fund Cycle (2020–2026)
H&F Buyout Fund XII (2023 Vintage)
EPBRP-TN (Chattanooga Electric Power Plan): $2.2M · CAFR / Board Packet (EPBRP 2025 Chattanooga ACFR, p.94)
Hudson Valley Emerald Coast Vanderbilt Institutional Outsourced CIO & Wealth Advisory: $100.0M · SEC Form ADV 7.B

Additional shared vehicles: H&F Corporate Investors XI (2023 Vintage) · H&F Equity Fund XI (2022 Vintage)

Potential introduction path · LPAC unconfirmed View LP Profile →
#2 Shared-Fund Peer 5 Shared Vehicles

Artémis (Pinault Family Holding)

Family Office / MFO Paris, France
Resolved Shared Vehicle Recent Fund Cycle (2020–2026)
H&F Corporate Investors XI (2023 Vintage)
EPBRP-TN (Chattanooga Electric Power Plan): $2.0M · CAFR / Board Packet (EPBRP 2025 Chattanooga ACFR, p.94)
Artémis (Pinault Family Holding): $133.8M · Allocator Webpage (Unanchored URL)

Additional shared vehicles: H&F Buyout Fund XII (2023 Vintage) · H&F Equity Fund XI (2022 Vintage)

Potential introduction path · LPAC unconfirmed View LP Profile →
#3 Shared-Fund Peer 5 Shared Vehicles

Fort Collins Dorchester Carmichael Institutional Outsourced CIO & Wealth Advisory

OCIO / Wealth RIA Fort Collins, CO
Resolved Shared Vehicle Recent Fund Cycle (2020–2026)
H&F Equity Fund XI (2022 Vintage)
EPBRP-TN (Chattanooga Electric Power Plan): $2.5M · CAFR / Board Packet (EPBRP 2025 Chattanooga ACFR, p.94)
Fort Collins Dorchester Carmichael Institutional Outsourced CIO & Wealth Advisory: $52.0M · SEC Form ADV 7.B

Additional shared vehicles: H&F Buyout Fund XII (2023 Vintage) · H&F Corporate Investors XI (2023 Vintage)

Potential introduction path · LPAC unconfirmed View LP Profile →

+283 Additional Institutional LPs Report Shared Vehicles with EPBRP-TN (Chattanooga Electric Power Plan)

Explore bilateral shared-fund paths in our Interactive Read-Only Demo or join the waitlist for full graph access.

Try Interactive Demo →
Pre-Launch Pilot Mode · Early-Access Waitlist

Request Pilot Access to Full Workspace Data for EPBRP-TN (Chattanooga Electric Power Plan)

You are viewing 5 open public preview records (out of 17 total tracked records for EPBRP-TN (Chattanooga Electric Power Plan)) with zero-registration primary source trails. Join the early-access waitlist to request pilot access:

  • All 17 tracked historical disclosure records (+12 gated rows) & field-level provenance
  • Bilateral Shared-Fund Co-Investor Graph (286 connected LPs)
  • Separated active searches, RFPs, approved FY2026 pacing plans & CIO governance updates
  • Retained gatekeeper consultants (1), investment contacts (4) & CRM export

Join the Early-Access Waitlist

Enter your firm email to request pilot onboarding for EPBRP-TN (Chattanooga Electric Power Plan) and our interactive GP workspace.

Strategies Disclosed by EPBRP-TN (Chattanooga Electric Power Plan)

Frequently Asked Questions: EPBRP-TN (Chattanooga Electric Power Plan)

What type of institutional allocator is EPBRP-TN (Chattanooga Electric Power Plan) and what is their typical disclosed ticket size?

EPBRP-TN (Chattanooga Electric Power Plan) is categorized under Public Pension Plan (Regional Roadshow Hub: Southeast (NC / GA / TN / SC / AL / KY / LA); Headquarters: Nashville, TN). Across 17 historical disclosure records tracked on Prilago ($112.2M total parsed USD across disclosed rows), the median disclosed amount is $2.2M (range: $1.2M to $37.0M).

Which private-market strategies appear in EPBRP-TN (Chattanooga Electric Power Plan)'s public disclosures?

EPBRP-TN (Chattanooga Electric Power Plan) has disclosed records across Buyout, Private Credit, Private Equity, Real Estate, Multi-Strategy. Open preview records include H&F Buyout Fund XII (2023 Vintage), H&F Corporate Investors XI (2023 Vintage), H&F Equity Fund XI (2022 Vintage), H&F Capital Partners X (2021 Vintage).

How are EPBRP-TN (Chattanooga Electric Power Plan)'s historical records substantiated and separated from active searches on Prilago?

Records for EPBRP-TN (Chattanooga Electric Power Plan) cite primary public disclosures (CAFR / Board Packet), and visitors can inspect 5 open source trails on this profile without registration. Each source trail displays field-level substantiation status, distinguishing exact commitment schedules from carrying-value or fee tables. Forward-looking active searches, RFPs, pacing plans, and governance updates are separated from historical disclosures.

How can General Partners request pilot access to EPBRP-TN (Chattanooga Electric Power Plan)'s full commitment history and contacts?

General Partners can join the early-access waitlist on https://prilago.com/lp/epbrp-tn-chattanooga-electric-power-plan or test fund suitability in the interactive read-only demo at https://prilago.com/demo.

Which institutional LPs report shared underlying fund vehicles alongside EPBRP-TN (Chattanooga Electric Power Plan)?

In Prilago's bilateral commitment graph, EPBRP-TN (Chattanooga Electric Power Plan) shares resolved underlying fund vehicles with 286 institutional LPs across 10 shared vehicles (shared fund exposure represents a potential introduction path and does not prove LPAC seat overlap or personal acquaintance). Top shared-fund peers include Hudson Valley Emerald Coast Vanderbilt Institutional Outsourced CIO & Wealth Advisory (5 shared vehicles, e.g. H&F Buyout Fund XII (2023 Vintage)), Artémis (Pinault Family Holding) (5 shared vehicles, e.g. H&F Corporate Investors XI (2023 Vintage)), Fort Collins Dorchester Carmichael Institutional Outsourced CIO & Wealth Advisory (5 shared vehicles, e.g. H&F Equity Fund XI (2022 Vintage)).

Related Public Pension Plan & Southeast (NC / GA / TN / SC / AL / KY / LA) Institutional LPs